Skip links

Change of Use Pricing

Change of Use Pricing

Through a unique combination of engineering, construction and design disciplines and expertise.

CHANGE OF USE PRICES

We prepare detailed Planning Applications, Building Regulation Drawings and Structural Calculations to achieve consent for your single-storey extension project with our extensive knowledge and experience. Please see our single-storey extension prices.

Spatial Planning and Layout
Site Survey
Ask a quote
Planning Application Drawings
Planning Application Drawings
Ask a quote
Restrospective Planning
Structure Calculations
Ask a quote
Building Regulation Drawings for Building Control
Building Regulation Drawings
Ask a quote

Studio20 architects

YEARS IN BUSINESS
0
PROJECTS COMPLETED
0
YEARS OF COLLECTIVE
0

Here’s what our clients have to say.

Frequently Asked Questions – Building Regulation Drawings, Structural Calculations & Costs

Building regulations drawings are a set of technical architectural documents that demonstrate your project complies with the UK’s Building Regulations. They cover structural safety, insulation, fire protection, accessibility, damp-proofing, and other performance requirements that must be approved by building control before construction can begin.

The building regulation drawings cost usually covers preparing detailed architectural plans, sections, elevations, details, and coordination with structural and MEP engineers. Studio20 prepares these drawings as part of your change-of-use or extension pricing package and includes submission support to building control.

The building regulation drawings cost varies with project complexity, scope, and services required. For example, Studio20’s pricing for building regulation drawings appears in their Change of Use pricing and may be quoted based on the work needed for your specific change-of-use project.

Structural calculations for building control are detailed engineering reports and analyses that show how the building’s structural elements (foundations, walls, beams, floors, and roofs) will safely carry loads. They are required by building control to ensure the structural safety of the altered or extended building.

Yes. Comprehensive architectural service fees often include building structural calculations, which are either prepared by an in-house engineer or coordinated with a specialist, to accompany your building regulations drawings when submitted to building control for approval.

Both building regulation drawings and structural calculations for building control help avoid delays, rejections, or onsite issues during construction. While they add to the upfront professional fees (reflected in packages such as the Change of Use pricing), investing in accurate documentation can save time and money during the build phase.

Yes, many architectural practices, including Studio20, can provide a preliminary building regulation drawings cost estimate once they understand your property, scope, and level of detail required. This is usually part of an early feasibility discussion before committing to full technical documentation. 

This website uses cookies to improve your web experience.
Home
Account
Cart
Search