From Old House to Dream Home in 5 Simple Steps

Objective

This blog shows you the five steps of a renovation in order, so you know who to speak to and what you should have in hand at each stage.

Key takeaways

  • Write your own list of problems before you look at designs.
  • Get a measured survey before any drawings.
  • Planning permission and Building Regulations are separate approvals, and you may need both.
  • Make every builder price the same drawings.
  • Keep a design professional involved until the work is signed off.

Introduction

Your old house has good bones. Thick walls, high ceilings, maybe a fireplace you actually like. It also has a kitchen too small for two cooks and a back bedroom that stays cold until June.

Here’s the thing: you’re not alone. A fifth of England’s homes were built before 1919, so plenty of owners are asking the same question: where do I start?

This guide lays out the home renovation steps in the order they should happen. Get the order right, and you save time, money and a lot of stress.

In this guide

  1. What is a house renovation?
  2. Step 1: Decide what your old house needs to do
  3. Step 2: Survey your home and test what’s possible
  4. Step 3: Turn your ideas into plans the council will read
  5. Step 4: Lock in technical drawings and Building Regulations
  6. Step 5: Tender, build and hand over
  7. The five steps at a glance
  8. Your 30-minute quick start
  9. Your house renovation London plan starts with one conversation
  10. FAQs

What is a house renovation?

A house renovation means updating a home you already own so it works better, stays warmer and suits how you live now. You keep the building and change what’s inside it, around it or on top of it.

Here are the key terms you’ll meet along the way.

 

Term What it means
Measured survey A detailed scale drawing of your home as it stands today
Planning permission Approval from your local council, which decides whether a proposed development should go ahead
Permitted development Minor works that don’t need planning permission, because their effect on neighbours and surroundings is likely to be small
Building Regulations Standards for the design and construction of buildings that protect safety and health
Tender A process where builders price the same set of drawings
Contract administration Someone checks the builder’s work against the contract while the job is underway

 

Step 1: Decide what your old house needs to do

Write down what annoys you.

Walk every room with a notepad. Cold hallway. Dark kitchen. No storage. Specific complaints lead to better design than “we need more space”.

Split must-haves from nice-to-haves

Pick three must-haves. A fourth usually means a bigger bill. Then set a budget range, and ask your designer how much to hold back for surprises.

Choose your route

 

Route Best for
Refurbish Tired finishes, poor layout
Extension A cramped kitchen or living area
Loft conversion An extra bedroom or office

 

If space is the problem, price a house extension or a loft conversion early.

Step 2: Survey your home and test what’s possible

Start with a measured survey.

Old houses are rarely square. Designing from guessed measurements is like buying a suit without trying it on.

Check what the walls are hiding.

Look for damp, cracks and past alterations. Finding them now beats finding them mid-build.

Talk to a design professional before a builder.

Here’s our view: speak to a design professional first. A builder tells you what a job costs. A designer tells you what’s possible. At Studio20, we offer a free site consultation, so you can test ideas before you commit.

Step 3: Turn your ideas into plans the council will read

Start with concept designs.

We sketch layouts based on your list, then refine them until you’re happy. Expect a few rounds.

Planning permission or permitted development?

Minor works can fall under permitted development. Bigger changes need planning permission, and your local council decides. Rules differ by borough, so house renovation London-wide is never one-size-fits-all. If your home is listed or in a conservation area, ask the council early, because extra rules apply.

Let someone else handle the paperwork.

Applications need scaled drawings and forms. We prepare and submit your planning permission application and deal with the council for you.

Step 4: Lock in technical drawings and Building Regulations

Planning is not Building Regulations.

What this really means is two separate approvals. Planning guides how places develop, while Building Regulations set standards for how buildings are made. For many types of building work, you need permission under both. Even internal alterations will probably need Building Regulations approval, though planning permission may not be needed. New electrics or a bathroom with plumbing are typical examples. See our Building Regulations page for more.

Get your structural calculations.

Take out a wall or convert a loft, and the loads change. Structural calculations show which beams and supports you need.

Pass building control

A building control body checks the work as it goes. That can be your local authority or a registered building control approver.

Step 5: Tender, build and hand over

Send out a tender pack.

A tender pack holds your drawings and written specification. Every builder prices the same thing, so you compare like with like.

Compare the quotes properly.

Let’s break it down: look beyond the total. Check what each price includes and ask about gaps. The cheapest quote isn’t always the best one.

Stay involved to the end.

Someone should check the work against the contract while it’s built. Then walk the house together, list any snags and sign off.

The five steps at a glance

 

Step Who leads What you hold at the end
1. Decide You A written brief and budget range
2. Survey Designer and surveyor Measured drawings and feasibility notes
3. Plan Designer and council A planning decision, or confirmation you don’t need one
4. Technical Designer, engineer, building control Technical drawings, calculations, Building Regulations approval
5. Build Builder and designer A signed-off finished home

 

Say you own a 1930s semi with a small kitchen and an empty loft. Your Step 1 list shows the kitchen bothers you most. The survey shows whether the structure can take an extension. By Step 3, you’re looking at one clear plan instead of five vague ideas.

Your 30-minute quick start

Do this today:

  • Photograph every room.
  • Write your five biggest frustrations.
  • Note the year your house was built.
  • Check your council’s website to see if you’re in a conservation area.

Bring that list to your first meeting. It saves everyone time.

Your house renovation London plan starts with one conversation.

Turning an old house into a dream home isn’t luck. It’s order. Know what you want, survey first, get your approvals, tender fairly and stay involved until the end. Follow these steps, and you cut the risk of expensive surprises.

Ready to start your house renovation London project? Book a free site consultation with Studio20, or request a quote. We’ll talk through your list, your house and your options.

FAQs

Where do I start when renovating an old house?

Write a list of what you want to change, then book a measured survey. Speak to a design professional before you hire a builder.

Do I need planning permission to renovate an old house?

Not always. Internal changes often don’t need it, but extensions and loft conversions may, and listed buildings have extra rules. Ask your local council before you start.

What is the difference between planning permission and Building Regulations?

Planning decides whether you can build. Building Regulations set standards for how you build, covering safety, health and energy use. You may need both.

What order should you renovate a house in?

Brief, survey, design and approvals, then tender and build. Getting approvals before you hire a builder helps you avoid changing plans mid-build.

How do I check if my house is in a conservation area?

Look at your council’s planning map or contact its planning team. Do this before you design anything.